Residential · Commercial · Institutional Construction

PROJECTS

CURRENT PROJECTS

Behar Construction, Co. has an exclusive contract with a German hotel group to do the Architectural, General Construction and Interior Design on three hotels in Miami. The locations for the hotels are Miami Beach, Downtown Miami, and Wynwood.

We are also designing and building a chain of award winning Italian restaurants called Primo Pastificio from Brazil. In Doral, Di Piu Manufacturing Corporation is a pasta factory that we are designing. Our latest restaurant DIRT in Mary Brickell Village is doing well. Last year we finished Vicky’s House. An 80’s themed milkshake bar by the owner of Lokal. We also did The Spillover by Lokal. A seafood rendition of his successful burger restaurants. The restaurants that we have built have become some of the hottest restaurants in South Florida and have come out all over the news and social media.  Furthermore, we are collaborating with our repeat  restaurant client Matt Kuscher the owner of Kush, Lokal, Vicky’s House, Spillover, and Stephan's on future restaurants.  We also just finished designing Stephan's and the latest Mojo Donuts in South Miami.


 

German Hotel Group Miami Beach Project

 

We are the remodeling a historic building and building a new 200,000 sqft tower and converting it into a chic boutique hotel with 350 Hotel Rooms, Two restaurants, Rooftop Lounge, and Rooftop Pool overlooking Miami Beach.


Location:  Miami Beach


Size of Project: 350,000 sqft


Construction Cost:  $100 Million


Project Completion:  Ongoing 


                                                                                                                                                                                                                                      


German Hotel Group Downtown Miami Project

 

Design/Development in the heart of the Central Business District in Downtown Miami, walking distance from Miami Central Station, the famous Flagler Street, American Airlines Arena, Miami Worldcenter, and the famous Bayside Marketplace. The project will consist of the redevelopment of a 15,000 square foot lot to build a mixed-use tower consisting of 234 residential luxury rental units, and a vibrant 220 room hotel with 2 restaurants, rooftop lounge and rooftop pool.


Location:  Downtown Miami


Size of Project: 60 + Story Height


Construction Cost:  +/- $90 Million


Project Completion: Ongoing 


                                                                                                                




German Hotel Group Wynwood Project

 

We are currently working with our partners in incorporating a hotel in the heart of Wynwood, part of a large master plan. We will be doing the Architecture, General Construction and Interior Design. It will be in the heart of Wynwood, and have two restaurants, rooftop lounge, and a rooftop pool.


Location: Wynwood


Size of Project: TBD


Construction Cost:  TBD


Project Completion: Ongoing

                                                                                                                  

 

 Buenos Aires Apartments 

 

We are currently waiting for permitting from the City Of Miami for a mixed use

development west of Brickell in one of Miami's hottest and up and coming

neighborhoods of Little Havana. It will feature retail space on the bottom floor

and loft style apartments walking distance from Brickell. 


Location:  Little Havana 


Size of Project: 10,000 sqft 


Construction Cost:  $2.3 Million 


Project Completion:  TBD

                                                                                                                ____________________


PREVIOUS PROJECT LIST



Mojo Donuts South Miami 

 

We completed the Design of the much anticipated Mojo Donuts latest trendy Donut Shop. 


Location:  South Miami


Size of Project: 1,200 sqft


Construction Cost:  TBD


Project Completion:  TBD



                                                                                                                


Stephans Restaurant 

We completed the design and conversion of a old run down Jewish Deli into a hip and chic version of a Jewish Deli. 


Location: Hialeah 


Size of Project: 1,500 sqft


Construction Cost:  TBD


Project Completion: May 2019

                                                                                                                 



Dirt Restaurant (Brickell) 


Dirt is a farm to table counter eatery and wellness bar combining fresh great tasting foods with with health, convenience and simplicity. This beautiful 2,000 sqft Restaurant was built from scratch. This is one of many restaurants they want to build.    

Location:  Mary Brickell Village 


Size of Project: 2,000 sqft


Construction Cost:  TBA


Project Completion:  Oct 2017 



                                                                                                                 



Vicky’s House by Spillover, Lokal and Kush 

New 80’s themed Milkshake Bar by owner Matt Kuscher, the creative genius

behind popular burger joint Lokal and Spillover in Coconut Grove and Kush in 

Wynwood. We recreated the owner’s moms house back in 1986. From the

popcorn ceiling, vinyl floors, and orange and gold  flower wallpaper copied

from old photographs. We did the Architecture and Construction of

the restaurant.


Location: Coconut Grove 

Size of Project: 1,500 sqft

Construction Cost: TBA 

Project Completion: March 2017 


                                                                                                      ______


Spillover Restaurant by Lokal and Kush

New restaurant by owner Matt Kuscher, the creative genius behind popular burger joint Lokal in Coconut Grove and Kush in Wynwood will be exploring seafood territory with the opening of The Spillover in Coconut Grove. We did the Architecture and Construction of the restaurant. We collaborated with the owner and local artist to create a one of a kind restaurant.


Location:  Coconut Grove


Size of Project: 2,500 sqft


Construction Cost:  TBA


Project Completion:  May 2016


                                                                                                                 


Mr. & Mrs. Bun Restaurant   

Remodeled existing restaurant. Electrical, Plumbing and Mechanical upgrades.

Interior finishes. 

Location: Kendall

Size of Project: 1,800 sqft

Construction Cost: TBA

Project Completion: August 2017


                                                                                                                


DIRT Restaurant (SouthBeach) 

Remodeled existing restaurant. Electrical upgrades. Interior finishes.

Location: Miami Beach

Size of Project: 1,600 sqft

Construction Cost: TBA

Project Completion: Dec 2016


                                                                                                                


Dr. Gena Chiropractic Office   

Designed and Built a beautiful and serene Chiropractic office. 

Location: Pembroke Pines

Size of Project: 1,500 sqft

Construction Cost: TBA 

Project Completion: May 2015




                                                                                                                


Aquasol Condominium


This project consist of the Concrete Restoration of a 16 Story High Rise Residential Condominium in Miami Beach, Fl. The Restoration consist of three main areas, The Residential Building, The Pool Deck, and Parking Garage Structure. The restoration of all structural members of a Parking Garage and the replacement of the waterproofing membrane and wearing surface at the Pool Deck on top of the Garage adjacent to the main Residential Building. Structural Reinforcing, Concrete Restoration, Waterproofing, Painting, Electrical, and Plumbing.

 

Location:  Miami Beach

Size of Project: 16 Story High Rise, Parking Garage, and Pool Deck

Construction Cost:  $3.5-4 Million

Project Completion:  Ongoing

                                                                                                                                                                                                                                                       
Ukrainian Catholic Church Of Miami
Assumption Of The Blessed Virgin Mary


40 Year Building Certification including Electrical and Structural, Architectural Plans, Electrical and Structural Repairs, and Restoration.

Location:  City Of Miami   

Size of Project: 8,000 sqft

Construction Cost:  $377,000.00

Project Completion:  Ongoing




                                                                                                                



Valsan Store


Architectural Design, Construction Plans and General Construction Services provided for a 20,000 sqft Retail Build Out. Scope Of Works included is Demolition, Interior Building Layout and finishes, Drywall, Structural Reinforcing, Fireproofing, Carpentry, and Interior Finishes, Roofing, Mechanical, Electrical, and Plumbing Improvements and Alterations.

Location:  Miami, Fl  

Size of Project: 20,000 sqft

Estimated Construction Cost:  $1 Million Dollars

Project Completion:  Oct 2010 




                                                                                                                
           

 

Newport Beachside Hotel and Resort


Hotel Lobby Interior Remodeling including Interior Design, remodeling, and Construction of Main Lobby, Bar Area, Front Driveway, Exterior Improvements, and Landscaping.

 

Location:  Sunny Isles Beach

Size of Project: 20,000 sqft

Construction Cost:  $2 Million

Project Completion:  February 2007

 

                                                                                                                

                                                                                                                                        

Miami Dade County Public Schools- Hialeah Elementary


Design Criteria Professional for Hialeah Elementary- New 2 story addition of 12,000 s.f.  consisting of a new Media Center, Art and Music Classroom and other classrooms for 4th and 5th grades. Also, additional improvements of Building #1 Classrooms to comply with CCTV, Security, Data, and Communication Improvements.

Location: Hialeah, Fl

Size of Project: 12,000 s.f.

Construction Cost:  $4.5 Million

Project Completion:  August 2006

 

                                                                                                                


Hollywod Medical Center 

Emergency Room Addition and Renovation
 

Location: Hollywood, Fl 

 

Size of Project: 7,500 s.f. 

Construction Cost:  $850,0000

Project Completion:  January 2006

 

  

                                                                                                                

 

Modern Healthcare, Inc 

Outpatient Surgical Center- Addition and Renovation
 

Location: North Miami , Fl 

Size of Project: 8,500 s.f. 

Construction Cost:  $975,0000

Project Completion:  October 2005 

 

                                                                                                                

 

North Miami General Hospital

Labor and Recovery Department Addition and Rennovation   

Location: North Miami , Fl 

Size of Project: 6,500 s.f. 

Construction Cost:  $575,0000

Project Completion:  February 2005 

 

                                                                                                                 



North Miami General Hospital

Emergency Department: Additions and Renovations 

Location: North Miami , Fl 

Size of Project: 10,500 s.f. 

Construction Cost:  $1.2 Million

Project Completion:  October 2004

 
                                                                                                                 


Jackson Memorial Hospital

Urgent Care Center/Emergency Room: Triage Area Renovation and Addition

Location:  Miami , Fl 

Size of Project: 8,500 s.f. 

Construction Cost:  $1 Million

Project Completion:  April 2004

 

                                                                                                                 

 

Miami Dade Aviation Department/ Building 845

Construction Administration of Six Story M.I.A. Office/ Warehouse Facility Project consisted of Re-Roofing, and Exterior Envelope Renovation.


Location: Miami International Airport

Size of Project:  20,000 SqFt Roof Area

Construction Cost: $1.5 Million

Project Completion: October 2006


                                                                                                                 
 



Miami Dade County Public Schools

Professional Services for Program Analysis, Evaluation, and Validation of several Public Schools within the North District for Capital Improvement of the 5 year school program services included school field verification and validation of Deficiencies, ADA Code Compliance,  HVAC, Electrical, Fire Alarm, Energy Evaluation, and “SREF” previously listed and other necessary improvements required to meet the 5 year program. Report Included a Budget Cost Estimate current with validation of the Scope of Work, Project Construction Schedule, and recommended contract type negotiation. (CM at Risk, Negotiation Contract, etc) 

 

Location: Miami Dade County

Size of Project: Varies

Construction Cost:  Varies from $1 million and up.


Project Completion:  December 2006

                                                                                                                 



Miami Dade County School- Miami Carol City Senior High School Replacement

Professional Services for Preliminary Program Evaluation and Design for Miami Carol City Senior High School Replacement. Services included Program Scope Development and Schematic Design alternatives of new high school replacement with incorporation of school academic curriculum and individual schools administration.

 

Location:   Carol City

Size of Project:  120,000 sqft

Construction Cost: $95 Million (projected construction cost)

Project completion: May 2006 


                                                                                                                 

Coral Gables Apartment


40 Year Building Certification including structural and electrical. 2 Story CBS Building with cement tile roof, and interior load bearing walls, independent electrical meter room. Recommendations were made for corrections of deficiencies and code violations.

Location:   Coral Gables

Size of Project: 2 story apartment complex 17,000 sqft

Construction Cost: $475,000

 

                                                                                                                  


Hialeah Shopping Center


40 Year Building Certification of 2 Story Shopping Center Complex with Retail and second floor offices. Building is a CBS and Interior Steel Column Bearing Structure. Study included Structural and Electrical evaluation with recommendations for repair of existing deficiencies.

Location:   Hialeah

Size of Project: 2 story shopping complex with office 45, 000 sqft

Construction Cost: $750,000

 

                                                                                                                 


City Of
Miami Office Complex

40 Year Building Certification of 4 Story Condo Office Complex Building is a CBS and PSI Concrete Structural System. Study included Structural and Electrical evaluation with recommendations for repair of existing deficiencies.

Location:   City Of Miami

Size of Project: 2 story shopping complex with office 80,000 sqft

Construction Cost: $675,000

 

                                                                                                                 



Broward
Community College / Child Development Center

Construction Administration of Child Development Center for Pre-School Children ages from 1 ½ to 5 years old. The Facility consisted of Learning and training daycare classrooms including administration offices, First Aid Isolation Room, and Staff Lounge for student capacity of 300 children. Services included cost effective management of project progress using several administrative tools as Primavera scheduling, Bi-weekly Construction Meetings, Daily Field Observation Reports, and Effective Trouble Shooting of everyday R.F.I. / Request For Information, and Preventive possible errors or non-conformance's. Additional Services included process and preview Shop Drawings Submittals, R.F.I.’s , R.F.P. - Request For Proposals, C.O.P. – Change Order Proposals, Monthly Pay Requisitions Review, and other administrative management tasks and responsibilities.


Location: Miami, Fl

Size of Project: 15,000 sqft

Construction Cost: $1.75 Million

Project Completion:  February 2005

                                                                                                                 



Miami Dade County Public Schools – Norland Elementary and Norland Middle School

 

Professional Services for Program Validation, Design Development, and Budget Development of Norland Elementary and Norland Middle School. Services included: Field Observation of School Facilities in order to evaluate, validate, and analyses to establish program scope of work given by M-DCPS, Also provide a Program Construction Cost Estimate of each described task listed, and


Location: Miami Dade

Size of Project: 120,000 sqft

Construction Cost: Budget $1-2 million.

Project Completion:  On going

 

                                                                                                                  



Miami Dade County Public Schools- Shenandoah Middle School


Construction Management of several Miami Dade County Public School projects included Design- Built Projects for Shenandoah Middle School, a three story building addition compare with previous budget amount for update and cost validation purposes. Project included Off-Site water and Fire Line Improvements, Emergency Generator, Fire Sprinkler System, Outdoor Patio Spill Out Area, and Full Pledge Kitchen

 

 Location:  Miami Dade County, City Of Miami

Size of Project: 21,000 s.f.

Cost of Project: $4.8 Million

Project Completion: August 2003

 

 

                                                                                                                  



Miami Dade County Public Schools – Ponce De Leon Middle School

 

Ponce De Leon Middle School was a 2 story addition of 18,000 s.f.  Project included On-Site Sewer Connection, Improvements in order to eliminate Campus Septic Tanks System. Also project consisted of New Bus Drop Area, Staff Parking, Basketball Courts, Covered Walkways, and P.E. Shelter/ Bus holding Area.

Location: City of Coral Gables

Size of Project: 18,000 s.f.

Cost of Project: $4.7 Million

Project Completion: September 2003

 

 

                                                                                                                  

 

Miami Dade County Public Schools- George Washington Carver Middle School

George Washington Carver Middle School was a Design-Built Project of a 3 story addition of 15,000 s.f.. Project Included Satellite Service, Kitchen/Dining Area, Administrative Offices, Data/Communication Classrooms, Science and Language Classrooms, and Art- Media Center Classrooms. Development of Staff and Visitors Parking including covered walkways connection.

 

Location: City of Coral Gables

Size of Project: 15,000 s.f.

Cost Of Project: $4.5 million

Project Completion: October 2003

 

                                                                                                                 

 


Miami Dade County Public Schools - Kinloch Middle School, State School

Construction Project Manager for Design-Build of Kinloch Middle School consisted of a Design/Built 3 story high Middle School.

Location:   City of Miami

Size of Project: 30,000 sf

Construction Cost:  $2.5 million

Project Completion:  October 2003

 

 
                                                                                                                 



WLRN Channel 17

Construction Project Manager for Design-Build of WLRN Channel 17, Digital Broadcast Tower and Transmitter Building, Pembroke Park, Fl., M-DCPS Project No. A0786,


Location: Pembroke Park, Fl

Size of Project:  5,000 sqft Warehouse and 1,000 sqft Tower Antenna.

Construction Cost: $7.6 Million.
 
Project Completion: January 2004

 

 

                                                                                                                 



Miami-Dade Community College

Architectural Design Professional for several Miami-Dade Community College Capital Improvement Projects for the North, South, Downtown, and Medical Campuses. Projects range from exterior and interior improvements to new additions and facilities modifications. Cost range from $2.5 to 7.5 million.

Location of Project:  Miami Dade County

Size of Project:   Varies

Cost of Construction: $2.5 to 7.5 Million

Project Completion:   December 2003

 

                                                                                                                 



MIA South Terminal Expansion Terminal


MIA South Terminal Expansion Terminal, Architectural Joint Venture with Borrelli & Associates Architects, and Mateu Carreño Rizo & Partners, Inc. Architects. Responsibilities included directing and coordinating the Design and Construction Documents of Miami International Airport South Terminal Expansion between the three joint venture offices and managing ADC’s architectural staff during all Phases of Contract Documents. Project construction cost estimated at $75 million.  Other projects included MIA’s Office of OIT Reservations and Communication for the airport,

 

Location:  Miami International Airport

Size of Project:  Varies

Construction Cost: $500,000.00 to $75 million

Project Completion:  December 2001

 

                                                                                                                 



City of South Miami Multi-Purpose Building

 

City of South Miami Multi-Purpose Building consisted of several multipurpose rooms with park related activities. Cost of project $1.2 million.


Location: City of South Miami

Size of Project: 7500 sqft

Cost of Construction: $1.2 million

Project Completion:  October 2001

 

 

                                                                                                                 


City of Miami Orange Bowl

 

City of Miami Orange Bowl Exterior Refurbishing Evaluation of stadium. Cost of project $1.3 million.  


Location: City of Miami

Size of Project: 120,000 sqft

Cost of Construction: $1.3 million

Project Completion: August 2001

 

                                                                                                                 



Tacolcy Development, Multi Family Development

 

Location: South Dade

Size of Project:  42 single family homes.

Construction Cost: $4.5 million. 

Project Completion: July 2001

 

                                                                                                                 



The Village Shops of Coconut Grove

 

 

The Village Shops of Coconut Grove; Phase I and II, Main Highway. Fast track, Design-built two-story 8 retail stores and retail tenant spaces.  Engle Building, Coconut Grove; Design-built major exterior/interior renovation of commercial retail store spaces as well as design-built six retail stores.

Location: City of Miami

Size of Project: 80,000 sqft

Construction Cost: $3.5 million

Project Completion: June 2001

 

                                                                                                                


Ocean Reef Club

Hurricane Repairs and damages of Presidential suite at Ocean Reef Club Hotel.

Location: Ocean Reef, Key Largo

Size of Project:  4500 sqft

Construction Cost: $1.7 million. 

Project Completion: May 2001

 

                                                                                                                 
                                                                                                                


Governmental Building Department Miami-Dade Building/ Southwest
 
Building Plans Processing Services Commercial, Residential, and Institutional Projects. Services included:  Review plans for S.F.B.C. – South Florida Building Code, and F.B.C. 2002 – Florida Building Code Compliance, Plans Review of Permit Applications.

Location:  Miami Dade West Branch

Cost of Projects:  N/A

Project Completion:  March 2005

 

                                                                                                                



Creative Environs of Lynn Wilson- Coral Gables, Fl


Project Architect

 

Projects Involved:  Fontainebleau-Hilton Hotel, convention hall addition, meeting rooms, and public spaces refurbishing. Palm Beach Polo Country Club; 2-story clubhouse. Coral Gables Country Club; addition and remodeling to existing facilities.

Location: Miami Beach

Cost of Projects:  $5 million

Project Duration:  1983-1984         

 

                                                                                                                


Aconi Constructors, Inc.- Miami, Florida                                                                                             
 

Construction Project Manager

Projects Involved:   IMC Hospital , remodeling of in-patient 6 floors.  Upper East Side Restaurant, Bal Harbour Shops; multilevel full service restaurant lounge.  Sita Inc., Miami Gardens; design and construction of UPS (computer back-up system) and emergency generator system.  Fort Lauderdale Nursing Home, 180 Beds and supporting facilities. Cost of Projects:  $5-10 million

Project Duration:  1982-1983

 

                                                                                                                

 

International Contractors of Miami - Miami, Florida

 Construction Project Manager

Projects Involved:  Metromall (Richards Dept. Store), Downtown Miami, 9-story retail store/office complex, built on fast-track schedule.  The Square at Key Biscayne; one and two-story condominium retail store/office complex. 

Brickell Plaza Condominium, high rise apartment building. 

Cost of Projects:  $21 million

Project Duration:   1980-1982

 

                                                                                                                


Fraga & Feito Architects- Miami, Florida

Project Architect, Production Department Chief

Projects Involved:   Gables International Plaza, 13-story office tower.  Hialeah Associated Office Building, Miami; 4-story and basement structure.  Coral Gables Federal S&L, Lauderhill Branch at Inverness Shopping Plaza; 1-story branch.  Medical Warehouses, Fort Clayton, Panama Canal Zone; 1-story medical facilities.  Mr. & Mrs. Davis

 

 Residence, Dade County; 2-story custom residence, 12,500 sq. ft.; Sunshine State Bank, South Miami; addition and remodeling.

 Size of Project: 135,000 sqft

Construction Cost: $12 million- 35 million

Project Duration:  1978-1980

 

                                                                                                                


Spillis- Candela & Partners, Inc

Project Architect

Projects Involved
:  Federal Reserve Bank of Atlanta, Miami; 1-story, 250,000-sq. ft. complex.  Shopping Center Jeddah, $75 million.

Location: Doral, Miami Dade

Size of Project: 250,000 sq ft

Construction Cost:  $75 Million

Project Duration: 1977-1978

 

                                                                                                                



Pavlo Engineering Co. - Coral Gables, Florida

Chief Architect, Department Head

Projects Involved:  Managing a team of architects and drafters for the design of South Dade Waste Treatment Plant including 11 auxiliary structures; cost of project $75 million.  

Location: South Dade

Size of Project: 10 buildings +/- 150,000 sqft

Construction Cost: $75 million

Project Duration: 1975-1977

 

 

 

 

   

 